Imagen de portada

¿Qué pasa con los pavimentos de las calles de bogotá?

Alberto Sarria Molina

Resumen


As use to happen with most civil works, the cost of pavement construction involves two components, the one direct corresponding to initial investment and the other in maintenance delayed in its economic life. High quality of design and materials represents a more expensive construction that needs less maintenance. For the construction of pavements in Bogotá, it has been usual to take in to consideration just the initial cost. This approach has shown to be very inappropriate because the duration of pavements obtained is much less than estimate, involving very high costs for repair. Those very brief notes on the subject finalize recommending to local authorities a change in the design approach that yields a better result in the long term. 

Texto completo:

PDF


DOI: http://dx.doi.org/10.16924%2Friua.v0i12.556

Enlaces refback

  • No hay ningún enlace refback.


Facultad de Ingeniería - 2019

Universidad de los Andes | Vigilada Mineducación

Reconocimiento: Decreto 1297 del 30/may/1964

Personería jurídica: Resolución 28 del 23/feb/1949 Minjusticia


LICENCIA DE REPRODUCCIÓN DE CONTENIDOS

Todos los contenidos de esta revista se rigen por la: licencia de Creative Commons Reconocimiento 4.0 Internacional.

Por medio de esta licencia se pueden compartir y redistribuir los contenidos de la Revista de ingeniería en cualquier medio o formato. Además, los contenidos se pueden adaptar, combinar y transformar para cualquier propósito, incluso comercial, siempre y cuando se le de crédito a la Revista de ingeniería y se sigan los parámetros estipulados por esta licencia.